- Add 60 new agents across all 10 categories (75 -> 135) - Add 95 new plugins with command files (25 -> 120) - Update all agents to use model: opus - Update README with complete plugin/agent tables - Update marketplace.json with all 120 plugins
54 lines
1.8 KiB
Markdown
54 lines
1.8 KiB
Markdown
Deploy the application to a target environment with pre/post checks.
|
|
|
|
## Steps
|
|
|
|
1. Determine the target environment from the argument (staging, production, preview).
|
|
2. Run pre-deployment checks:
|
|
- All tests pass: run the test suite.
|
|
- No uncommitted changes: `git status --porcelain`.
|
|
- Branch is up to date: `git fetch && git status -uno`.
|
|
- Build succeeds: run the build command.
|
|
- No critical vulnerabilities: run dependency audit.
|
|
3. Detect the deployment method:
|
|
- **Vercel/Netlify**: `vercel --prod` or `netlify deploy --prod`.
|
|
- **Docker**: Build image, push to registry, update deployment.
|
|
- **Kubernetes**: Apply manifests with `kubectl apply`.
|
|
- **SSH**: rsync build artifacts and restart service.
|
|
- **GitHub Pages**: Push to `gh-pages` branch.
|
|
4. Execute the deployment:
|
|
- Tag the deployment: `git tag deploy-<env>-<timestamp>`.
|
|
- Run the deployment command.
|
|
- Wait for health check confirmation.
|
|
5. Run post-deployment verification:
|
|
- Hit the health endpoint and verify 200 response.
|
|
- Run smoke tests if available.
|
|
- Check error rates in monitoring if accessible.
|
|
6. Report deployment status with rollback instructions.
|
|
|
|
## Format
|
|
|
|
```
|
|
Deployment: <environment>
|
|
Version: <git-sha-short>
|
|
Status: <success/failed>
|
|
|
|
Pre-checks:
|
|
- [x] Tests passing
|
|
- [x] Build successful
|
|
- [x] No uncommitted changes
|
|
|
|
Deployed at: <timestamp>
|
|
URL: <deployment-url>
|
|
Health: <healthy/unhealthy>
|
|
|
|
Rollback: <rollback-command>
|
|
```
|
|
|
|
## Rules
|
|
|
|
- Never deploy to production from a non-default branch without explicit confirmation.
|
|
- Always run pre-deployment checks; abort on any failure.
|
|
- Create a deployment tag for every production deployment.
|
|
- Include rollback instructions in every deployment output.
|
|
- Verify the health endpoint responds within 60 seconds after deployment.
|